| Activity | Details |
|---|---|
| Assignment | Assuming you are working on the installation of the PV systems and your task is to plan and manage the entire project from design to installation stages.
(Hint: use the flowchart of the PV project process as a guideline for the steps) DeliverablePrepare a report showing Parts 1 and 2. The report is to be no more than three double-spaced pages in a 12 point font. Include the tables from the Excel spreadsheets. |
| Submission Instructions and Grading | Please visit the Lesson Activity page in Canvas for submission instructions and grading information. |